Avril 2022

v5.2

New improvements just in time for springtime:

  • Better performance during the initial loading of the calendar and when fetching tasks
  • Archiving user accounts becomes easier thanks to a visual indication of roles linked to archived entities

This version also includes multiple bug fixes related to the sudden, temporary disappearance of newly created tasks and those linked to assignees originating from multiple service points. We apologize if these abnormal behaviors affected your operations over the past few months.

Thank you very much, and please continue to send us your feedback and bug reports at info@wpred.com!

Avril 2022

v5.2

Quelques nouveautés pour le printemps :

  • Amélioration de la performance de chargement initial du calendrier et de la récupération des tâches
  • Archivage des comptes utilisateurs désuets facilité par l'indication des rôles reliés à des entités archivées

Cette version inclut également plusieurs correctifs reliés à la disparition soudaine et temporaire de tâches nouvellement créées ou associées à des intervenants venant de multiples point de service. Nous sommes désolés si ces comportements anormaux ont affecté vos opérations au cours des derniers mois.

Merci beaucoup - et s'il vous plaît continuez de nous envoyez vos commentaires et vos rapports d'anomalies à info@wpred.com!

March 2022

v5.1

The integration between wpred.com weather maps and the WPlanif maintenance calendar gets an update with the new concept of work site categories.

Site categories

Work sites must now be link with a single "Site category":

Site category: set on work site

The chosen category appears as a colored badge next to the work site name within the main calendar:

Site category: appears next to site name

The list of available categories can be customized through the management interface:

Site categories management access

The initial list of categories is purely a suggestion and should be customized to your liking:

Site categories management screen

Note: The first site category in the list is the "default" category applied to new work sites.

Service point coordinates

Assignee groups that are flagged as being Service Points can now be customized further to add the proper coordinates of the team's home base:

Service point coordinates

Note: When no coordinates are given and the service point appears on a map (see below), the geographical average of all its linked work sites (and their equipment) will be used.

WPlanif entities on wpred.com maps

These new options open up the possibility of mapping regions, service points and work sites on regional maps. These maps can be made available within your organization's wpred.com account (separate login required):

Regional map

Please contact us at info@wpred.com if you are interested in supplementing your forecasts with such maps.

Mars 2022

v5.1

L'intégration entre les cartes météo de wpred.com et le calendrier WPlanif reçoit une mise à jour avec le nouveau concept de catégorie de site.

Catégories de site

Les sites de travail doivent dorénavant être reliés à une "Catégorie de site" :

Catégorie sur un site

La catégorie sélectionnée apparaît en tant qu'icône coloré à côté du nom du site dans le calendrier principal :

Catégorie de site dans le calendrier

La liste des catégories disponibles peut être modifiés via les écrans de configuration :

Catégories de site: accès à la configuration

La liste de départ ne contient que des suggestions et nous vous encourageons à la modifier à votre guise :

Catégories de site: liste configurable

Note: La première catégorie au haut de la liste est celle "par défaut" qui sera reliée à tous les nouveaux sites.

Coordonnées de point de service

Les groupes d'intervenants qui ont l'option "Est un point de service" de cochée peuvent dorénavant être bonifiés avec les coordonnées exactes de la caserne de l'équipe :

Coordonnées du point de service

Note: Lorsqu'aucune coordonnées sont indiquées et que le point de service apparaît sur un carte (voir ci-bas), la moyenne géographique de tous les sites reliées (et de leurs éoliennes) sera utilisée.

Entités WPlanif sur les cartes wpred.com

Ces nouvelles options permettent d'afficher les régions, les points de service et les sites de travail sur des cartes régionales. Ces cartes peuvent devenir disponible via le compte météo de votre organization sous wpred.com (connexion distincte requise) :

Carte régionale

Merci de nous contacter via info@wpred.com si vous souhaitez bonifier vos prévisions avec de telles cartes.

February 2022

v5.0

WPlanif can now help you with your mid-to-long term capacity planning. Also, new archival features in the management interface help you phase out old reference entities with ease.

Capacity planning

Task form updates

The work task form's advanced properties panel was reworked and the entire form was enhanced to make obvious the:

  1. Number of work hours in the task's start-to-end time window
  2. Total theoretical effort on-site implied by the "man-hours per machine" workload estimate, multiplied by the number of wind turbines associated with the task
  3. Number of hours of worked assigned to technicians in the team schedule - with a comparison vs. the expected workload

hover on image to zoom in

Time window, workload and assignments

When the theoretical effort field of "man-hours per machine" is cleared and the value is Unknown, the workload is automatically determined to correspond to the number of total hours booked in the assignee schedules:

hover on image to zoom in

No man-hours per machine

Tip: Hover over the field to the right of "Total theoretical workload": it explain the logic of the workload sums.

Capacity analysis per assignee group

These per-work-task values are then summed and aggregated over an entire Assigne Group calendar (covering the current time period selected) to give us a brand new Capacity Analysis accessible at the top-right of the list of the team's work site calendars:

Capacity analysis button

The capacity planning panel replaces space taken up usually by the work site calendars. It breaks down the statistics in two sections:

  1. Workload on-site - The top panel lists the per-task-type totals of hours of work planned on the site calendars
    • In the header: a summary of the number of work sites and turbines under the purview of this Assignee Group
    • If you hover on each section of the horizontal histogram, a tooltip will appear with a work-breakdown summary and the percentage of that planned work which has already assigned to technicians
    • Those work hours that have already been booked are also represented in the Assignments section below
  2. Schedule of the current team - The bottom panel displays the bookings and availability on the current group's assignee calendars, broken down in three sections horizontally:
    • In the header: a summary of the number of assignees and the total number of man-hours they correspond to across the currently selected time window
    • At the left: the "siteless" tasks and schedule constraints (e.g. assignments that have no link to a wind farm, such as office work and holidays)
    • In the middle: the tasks assigned to technicians on work sites. Note that this section's leftmost extremity lines up vertically with the leftmost extremity of the workload histogram at the top. This is highlighted by the orange vertical line.
    • At the right: the free time remaining that remains unbooked on the assignee calendars

hover on image to zoom in

Capacity analysis

In the example above, all Preventive Maintenance and Foundation Work have yet to be assigned, but you can visually determine that there are more than enough free hours in the assignee calendars to fullfil this workload.

Please note that it is possible to complete a capacity analysis on past time periods in a historical fashion. However, the Schedule of the current team section only takes into account the current list of active assignees in the group. It is highly likely that old technicians have since been archived and that new ones have been introduced to the assignee group. In such cases, the recommendation is to temporarily adjust the set of active technicians by archiving/reactivating them in the management interface before completing a capacity analysis.

Capacity planning edge cases

Here are a few more example of Workload on-site (i.e. the "demand" for human resources) vs. Team schedule (the "offer") which highlight different troublesome capacity planning situations.

Example 1 - When too much work has been planned on the work sites, and we don't have enough assignee capacity fullfil this demand (i.e. not enough free time remaining):

hover on image to zoom in

Capacity analysis: too much workload

Example 2 - When no free time remains in the assignee calendars and their schedule has been overbooked (leading also to missing capacity to fulfill the as-of-yet unbooked workload):

hover on image to zoom in

Capacity analysis: overbooked

Other teams and external contractors

The workload on-site can be fulfilled by 3 types of assignees:

  1. Technicians from the local team - i.e. from the Assignee Group currently selected on which we have opened the capacity analysis panel
  2. Assignees from other teams within the company (for example, technicians from other service points who have come to support the local team)
  3. Subcontractors, i.e. "External Assignees"

The new capacity analysis panel also highlights work that has been planned with assignees that don't belong to the local team. The portions of work completed by other teams and being subcontracted appear in:

  • The tooltips of the main Workload on-site section
  • A third histogram at the bottom dedicated to work handled by other teams
  • A fourth one dedicated to subcontracted work

hover on image to zoom in

Capacity analysis: external contractors

Archival of reference entities

When it comes time for a bit of Spring cleaning, the WPlanif management functionality has been historically lacking. With v5.0, WPlanif introduces the "Archive" action on all types of entities in the calendar management screens.

For example, you can archive a Task Type from the list in their management screen:

Archive task type

And from the archived elements page, you can restore the item - should you need it again down the road:

Unarchive task type

Please send us your feedback at info@wpred.com. We look forward to hearing back from you.

Février 2022

v5.0

WPlanif peut dorénavant vous aider dans vos analyses de capacité à moyen et long terme. De plus, les nouvelles fonctionnalités d'archivage vous permettent de cacher les anciennes entités de référence qui ne servent plus.

Analyse de capacité

Mise à jour du formulaire de tâches

La section des informations avancées du formulaire de tâches a été retravaillée et le formulaire en entier a été bonifié afin de rendre plus évident :

  1. Le nombre d'heures travaillables dans la fenêtre de temps du début à la fin de la tâche
  2. L'effort théorique total correspondant à la charge de travail sur site: i.e. la multiplication du nombre "d'heures-hommes par machine" prévu et du nombre d'éoliennes associées à la tâche
  3. Le nombre d'heures assignées à l'horaire de l'équipe de techniciens - avec une comparaison de ces heures vs. la charge de travail (en pourcentage)

survoler l'image pour l'agrandir

Fenêtre prévue, charge de travail et heures assignées

Lorsqu'on vide la valeur d'effort théorique en "heures-hommes par machine" et que ce champ est Inconnu, la charge de travail est déterminée automatiquement par le nombre d'heure assignées dans les calendriers des intervenants :

survoler l'image pour l'agrandir

Pas d'heures-hommes par machine

Truc : Survolez le champ à droite de "Charge de travail théorique totale" qui explique la logique de somme de charge de travail.

Analyse de capacité par groupe d'intervenants

Les valeurs ci-haut des tâches individuelles sont agrégées sur toute la plage horaire présentement sélectionnée et sur la totalité des calendriers d'un groupe d'intervenants, afin d'obtenir la toute nouvelle Analyse de Capacité accessible via le bouton en haut à droite de la liste des calendriers d'une équipe :

Lien vers l'analyse de capacité

Le panneau d'analyse de capacité remplace l'espace pris habituellement par les calendriers de site. Les statistiques y sont séparées en deux sections :

  1. Charge de travail sur-site - Le panneau du haut contient les totaux, par type de tâches, des heures de travail prévues sur les calendriers de sites
    • Dans l'en-tête: un résumé du nombre de sites et d'éoliennes sous le giron de ce Groupe d'Intervenants
    • Lorsque vous survolez chaque bloc de l'histogramme, un ballon explicatif s'affiche avec un résumé des travaux prévus ainsi qu'un pourcentage des travaux qui ont déjà été assignés à des techniciens
    • Ces heures de travail qui ont déjà été assignées sont également représentées dans la section Horaire de l'équipe plus bas
  2. Horaire de l'équipe - Le panneau du bas résume l'emploi du temps et la disponibilité dans le calendrier des intervenants, séparé en trois grandes sous-sections horizontales:
    • Dans l'en-tête: un résumé du nombre de techniciens et du nombre d'heures-hommes disponibles à leur horaire sur la plage horaire présentement sélectionnée (2 semaines, 1 mois, 3 mois, etc.)
    • À gauche: les tâches "hors-site" et les contraintes d'horaire (e.g. les tâches reliées à aucun site de travail et autres contraintes telles que les vacances)
    • Au centre: les tâches assignées aux techniciens sur les sites de travail. Notez l'alignemement de la gauche de cette sous-section est vis-à-vis verticalement avec l'extrême-gauche de l'histogramme de la charge de travail sur-site un peu plus haut. Ceci est mis en évidence par la ligne orange verticale.
    • À droite: les heures libres à l'horaire qui ne sont toujours pas remplies dans les calendriers de techniciens

survoler l'image pour l'agrandir

Analyse de capacité

Dans l'exemple ci-haut, tous les travaux de type "Preventive Maintenance" et "Foundation Work" ne sont pas encore assignés - mais nous pouvons visuellement déterminer qu'il y a assez d'heures libres à l'horaire des techniciens pour remplir cette demande de main d'oeuvre.

Veuillez noter qu'il est possible d'afficher l'analyse de capacité sur les plages horaires du passé afin de compléter une analyse historique. Par contre, la section Horaire de l'équipe ne prend en compte que la liste des intervenants présentement actifs dans le groupe au moment où l'analyse est lancée. Il est donc fortement possible que de vieux techniciens aient été archivés ou que de nouveaux intervenants aient été ajoutés depuis le temps cerné par l'analyse. Dans ce cas, il est conseillé d'ajuster la liste des techniciens actifs en les archivant/réactivant temporairement via les écrans d'administration avant de compléter votre analyse.

Cas limites d'analyse de capacité

Voici quelques autres exemples de Charge de travail sur-site (i.e. la "demande" de main-d'oeuvre) vs. Horaire de l'équipe (i.e. "l'offre") qui démontrent quelques scénarios problématiques de manque de ressources humaines.

Exemple 1 - Lorsque trop de travaux ont été prévus à l'horaire sur les parcs et que nous n'avons pas assez d'heures libres à l'horaire des techniciens pour fournir à la demande :

survoler l'image pour l'agrandir

Analyse de capacité: charge de travail trop grande

Example 2 - Lorsqu'il n'y a plus d'heures libres à l'horaire des intervenants et que leurs calendriers sont surchargés (menant également a une impossibilité de répondre à la demande):

survoler l'image pour l'agrandir

Analyse de capacité: horaire surchargé

Autres équipes et sous-traitants

La charge de travail sur-site peut être complétée par 3 types d'intervenants :

  1. Les techniciens de l'équipe locale - i.e. le Groupe d'intervenants présentement sélectionné sur lequel nous avons démarré une analyse de capacité
  2. Des intervenants d'autres équipes de la compagnie (venus en renfort à partir d'autres points de service, par exemple)
  3. Des sous-traitants, i.e. les "Intervenants Externes"

Le nouveau panneau d'analyse de capacité met également en valeur les travaux qui ont été planifiés avec les intervenants qui n'appartiennent pas à l'équipe locale. La portion des travaux octroyés aux autres équipes et aux sous-traitants est illustrée dans:

  • Les infobulles de la section de Charge de travail sur-site
  • Un troisième histogramme au bas de l'écran dédié aux travaux d'autres équipes
  • Un quatrième histogramme pour ceux en sous-traitance

survoler l'image pour l'agrandir

Analyse de capacité: autres équipes et sous-traitants

Archivage des entités de référence

Lorsque vient de temps de faire un ménage du printemps, les fonctionnalités de gestion de WPlanif manquaient de flexibilité à l'époque. Avec v5.0, WPlanif introduit une nouvelle action "Archiver" sur tous les types d'entités dans les écrans de gestion du calendrier.

Par exemple, vous pouvez archiver un type de tâche à partir de leur liste de gestion :

Archiver un type de tâche

Ensuite, à partir de liste des éléments archivés, il est possible de réactiver cet item - advenant le cas où il redevient utile éventuellement :

Dé-archiver un type de tâche

Merci de nous envoyer vos commentaires à info@wpred.com. Nous avons hâte de connaître votre opinion.